Ideal for reliable emergency back up generation in the 900 to 1000 Kw range and for users desiring to also burn natural gas fuel.. The GPS1250 is ideal for emergency back up power for use in: Data Centers, industrial process plant applications, hospitals, universities, shopping malls, high rise apartmant buildings, office complexes , pharmaceuticals, aquariums, back up to steam power plants, LNG Terminals, subway and electric railway systems, and other industrial facilities. The GPS1250 goes from start to full load in 40 seconds. This unit is light weight compared to diesel gen sets and can be roof mounted. Also unlike diesel engine gen-sets , this GT unit can also burn natural gas fuel eliminating the need to install cumbersome fuel oil tanks on site. |
|
A Closer Look
Our GPS units go from start to full load in 40 seconds. They are light weight compared with heavy diesel engine systems and can be roof mounted freeing up valuable real estate. Also unlike diesel gen sets, our GPS GT units can burn either natural gas or liquid fuel. or both. For natural gas units - there is no need to install cumbersume large diesel fuel oil tanks on site to accomodate days of unit operation. Studies show that natural gas pipline fuel is typically available when local power distribution lines go down due to storms.
|
| Units Performance, weights and dimensions - US Customary Units (Switch To Metric) | |||||
| Electric Output | Dimension (L,W,H) | Weight | Exhaust Gas Temp. | Exhaust Gas Flow | |
| kWe | feet | lbs | °F | cu ft / hr | |
| 1,000 | 15.2 X 6 X 8 | 21,000 | 1,112 | 34,260 | |
Fuel:
GPS units - standard fuel is liquid - Dual fuel option is availabel Natural Gas fuel
Note:
Performance based on 4 inch and 10 inch H2O intake / exhaust pressure losses
Sea level site
|
Standard Equipment
|